The John Bear Project

Classified as a mid-range project

project highlights

  • Magnetic Core and Coil replaced with high frequency electronic HID ballasts
  • Improved lumen output resulting in more light where it is needed most in the showroom, service and wash bays
  • OPA rebate of approximately 20% of project cost
  • Reduced energy consumption resulting in a lower fixed operational cost per month
  • Total system cost savings of 50%
  • Payback period of 29 months
  • Environmental impact reduction of 47 metric tonnes of CO2 and 13 metric tonnes of Carbon