The John Bear Project
Classified as a mid-range project
project highlights
- Magnetic Core and Coil replaced with high frequency electronic HID ballasts
- Improved lumen output resulting in more light where it is needed most in the showroom, service and wash bays
- OPA rebate of approximately 20% of project cost
- Reduced energy consumption resulting in a lower fixed operational cost per month
- Total system cost savings of 50%
- Payback period of 29 months
- Environmental impact reduction of 47 metric tonnes of CO2 and 13 metric tonnes of Carbon