The Brian Cullen Project

Classified as a large project

project highlights

  • Magnetic Core and Coil replaced with high frequency electronic HID ballasts and T5HO fluorescent technology
  • Improved lumen output resulting in more light on the showroom, bodyshop and service centre floor
  • OPA rebate of approximately 27% of project cost
  • Reduced energy consumption resulting in a lower fixed operational cost per month
  • Total system cost savings of 48%
  • Payback period of 25 months
  • Environmental impact reduction of 112 metric tonnes of CO2 and 31 metric tonnes of Carbon

Brian Cullen Before Brian Cullen After