The Brian Cullen Project
Classified as a large project
project highlights
- Magnetic Core and Coil replaced with high frequency electronic HID ballasts and T5HO fluorescent technology
- Improved lumen output resulting in more light on the showroom, bodyshop and service centre floor
- OPA rebate of approximately 27% of project cost
- Reduced energy consumption resulting in a lower fixed operational cost per month
- Total system cost savings of 48%
- Payback period of 25 months
- Environmental impact reduction of 112 metric tonnes of CO2 and 31 metric tonnes of Carbon