The Baycoat Project

Classified as a large project

project highlights

  • Magnetic Core and Coil replaced with high frequency electronic HID ballasts and HO T5 fluorescent technology
  • Improved lumen output resulting in more light on the manufacturing floor resulting in enhanced employee productivity
  • OPA rebate of approximately 40% of project cost
  • Reduced energy consumption resulting in a lower fixed operational cost per month
  • Total system cost savings of 60%
  • Payback period of 13 months
  • Environmental impact reduction of 314 metric tonnes of CO2 and 86 metric tonnes of Carbon

Baycoat Before Baycoat After