The Aqua Centre Project
Classified as a small project
project highlights
- Magnetic Core and Coil replaced with high frequency electronic HID ballasts and T5HO fluorescent technology
- Improved lumen output resulting in more light over the swimming pool resulting in an enhanced customer experience
- OPA rebate of approximately 20% of project cost
- Reduced energy consumption resulting in a lower fixed operational cost per month
- Total system cost savings of 38%
- Payback period of 46 months
- Environmental impact reduction of 8 metric tonnes of CO2 and 2 metric tonnes of Carbon