The Aqua Centre Project

Classified as a small project

project highlights

  • Magnetic Core and Coil replaced with high frequency electronic HID ballasts and T5HO fluorescent technology
  • Improved lumen output resulting in more light over the swimming pool resulting in an enhanced customer experience
  • OPA rebate of approximately 20% of project cost
  • Reduced energy consumption resulting in a lower fixed operational cost per month
  • Total system cost savings of 38%
  • Payback period of 46 months
  • Environmental impact reduction of 8 metric tonnes of CO2 and 2 metric tonnes of Carbon

Aqua Centre Before Aqua Centre After